ManePoint.com all about Horse Riding and Ownership, Equine, Equestrian Call Us for FREE! (866) 728-9719
  discussion   |   email   |   myProfile      TractorPoint   |   Hunting and Shooting at Barrelpoint          Login | Sign Up
Topic Search  (advanced)


New As Posted | Active Subjects

Call Us for FREE! (866) 728-9719

Outside NC?  You Pay No Tax!
     Click for TP MowerAxle Review !
Get back your garage floor, ease maintenance! Free Shipping

Hitch up with us !

New Posts (click to View)
Hot Subjects
Featured Suppliers

Lightscapes Landscape Lighting
      LightscapesCT.com



Click to Post a New Message!

Discussion Boards > Active Subjects > Messages as Posted > Barns and Out Buildings Forum

Page [ 1 ] | 2 | | Next >>
Reply | Pop Up Window Reply
Posted BySubject :Excavating for Pole Barn
cdcole
2004-06-05
Post: 87807

ManePoint Premium Member -- 5 Horses = Expert
Gentlemen,

I hope that someone has some experience with this. Here is my situation: 1) I am having Northland Buildings erect a pole barn for me. 2) The area is flat and free of trees. 3) I would like to prepare the site and fill with gravel with my TC25D and loader. 4) I would like to see pictures or get instructions as to how others have prepared their pole barn site. 5) Does this project really require a $2000 excavation? 6) My soil does not have a lot of sod - my plan was to build a soil mound 1 foot higher than surrounding area- then cover with another 4-6" of gravel - level everything then call the erectors. Please lend your experiences to me.

Cliff



harvey
2004-06-06
Post: 87829
ManePoint Premium Member -- 5 Horses = Expert

2 Filter by User
Built many and building one now. Strip off the top soil at least 6-8 inches deep. If sub soil is real sticky (clay) I'd use ground fabric also. Have bank run gravel brought in to back fill 6-8 inches above your old grade. I like to see at least 2 feet extra around all sides. Have building built bring in #1st or #1 stone or Course Sand to set your final grade prior to pouring concrete.

If you are heating the pole barn structure there are other things to consider...

Reply to PostReply
cdcole
2004-07-04
Post: 90026
ManePoint Premium Member -- 5 Horses = Expert

2 Filter by User
Here is the deal - all topsoil has to be stripped then fill with large stone (2-3" dia.) about 3" deep. Then gravel - 3-4". Then add as much stone necessary to get the floor level and 6" above grade.

That is the guidance from an excavator. Backfill to create side slopes.

Reply to PostReply
Oliver
2004-07-04
Post: 90057
ManePoint Premium Member -- 5 Horses = Expert

2 Filter by User
As soon as my building permit is approved I will be adding a 12x32 runout shelter to an existing barn. I was told to dig down 12"-18" and put stone, gravel, and stonedust, in that order. I know an excavator can do the work in a matter of hours. I have a Kubota 7510 and LA 302 loader. Any thoughts on whether or not I can do this myself? I don't mind taking longer to save money, but if it's going to take days rather than hours it might not be worth it. Any thoughts? Suggestions?

Reply to PostReply
grinder
2004-07-10
Post: 90487
ManePoint Premium Member -- 5 Horses = Expert

IMHO
Hire the guy if you can afford too. Don't forget the subgrade and drain before you start filling it.Compact before the stonedust and again after.

Good luck.

Reply to PostReply
Oliver
2004-07-10
Post: 90520
ManePoint Premium Member -- 5 Horses = Expert

2 Filter by User
Spent the day using a friends 2910 with backhoe. I had lots of fun and moved a huge amount of dirt (my 7510 was great as the designated pile mover). Hopefully I can clean up the mess I made tomorrow. Tomorrow will also be a test of sorts as I try and dig for 4 piers. If I can't do it, my trusty manual post hole digger is at the site.

I still might need to hire an excavator to make sure the job is done right; but I have had fun trying so far!

Reply to PostReply
brokenarrow
2004-07-11
Post: 90535
ManePoint Premium Member -- 5 Horses = Expert


View my Photos  Pics

Having fun trying is what its all about!
Good job

Reply to PostReply
lbrown59
2004-09-18
Post: 96794
ManePoint Premium Member -- 5 Horses = Expert

2 Filter by User
If you are heating the pole barn structure there are other things to consider...
harvey
==================
I PLAN ON HEATING & Air Conditioning my 30x 52.
For my 22 X 76 I plan on heating one 16 x 22 stall.
What other things should I consider... ?

Reply to PostReply
lbrown59
2004-09-18
Post: 96795
ManePoint Premium Member -- 5 Horses = Expert

2 Filter by User
If you are heating the pole barn structure there are other things to consider...
harvey
==================
I PLAN ON HEATING & Air Conditioning my 30x 52.
For my 22 X 76 I plan on heating one 16 x 22 stall.
What other things should I consider... ?

Reply to PostReply
harvey
2004-09-19
Post: 96832
ManePoint Premium Member -- 5 Horses = Expert

2 Filter by User
Keeping frost away from the slab and not heating the soil around the permiter is a challenge. I like to use a 1' vertical piece of 2" foam with 14" alum flashing to protect it on the outside. I also like a 2' wide piece of 2" foam horizontal around inside to help keep heat in.

I do not think you have to use foam under the entire floor.

Reply to PostReply